Readers: [All]
Authors: [All]
Login
Lost password?
DOCUMENTS
->
Documents by WP
->
Documents by TF
->
Documents by Author
->
Documents by Keyword
->
Documents by Type
->
Documents by Date
CREATE
->
New document
Title
Last modified
Agenda
TF12 - T2 Lite Field Trials Report
03/12/2013 05:09:37 PM
PCC10 TF12 - T2-Lite Field Trials Validation Plan
03/12/2013 05:09:33 PM
TF11 - Technical Report TR11.2 - NGH-Ph.1 Lab Test Validation Plan
03/12/2013 05:09:13 PM
TF11 - Deliverable D11.1 - DVB-T2 Advanced Features Lab Test Report
03/12/2013 05:09:08 PM
Deliverable D10.2 - specification of prototypes step 2
03/12/2013 05:08:51 PM
ENGINES TF9 TR9.3 Interim Report on Network Structure Requirements for T2 and NGH
03/12/2013 05:08:40 PM
Panlab Ativities, Midterm Report
03/12/2013 05:08:22 PM
ENGINES_T2MIAnalyzer_v1
03/22/2012 01:55:47 PM
ENGINES_T2InteroperabilityTests_v1
03/22/2012 01:54:37 PM
Leaflet
03/19/2012 04:04:29 PM
TF12 Advanced Test Plan
10/11/2011 04:45:52 PM
WP4 Presentation in PCC05
04/06/2011 12:56:58 PM
Field Trials Presentation in PCC05
04/06/2011 12:52:56 PM
Radio Cognitve Presentation in PCC05
04/06/2011 12:49:33 PM
TF11.D1 - DVB-T2 Advanced Features Test Plan v.01.2
03/29/2011 04:25:10 PM
ENGINES Logo-type
05/26/2010 12:08:22 PM
Deliverable
TIME-FREQUENCY SLICING (TFS) ANALYSIS, MEASUREMENTS AND SIMULATIONS
03/12/2013 05:09:41 PM
DVB-T2 Advanced features test report
03/12/2013 05:09:29 PM
TF11-D1 V.03 - DVB-T2 Advanced Features test plan
03/12/2013 05:09:25 PM
TF11 - Deliverable D11.2 - NGH-Ph.1 Lab Test Report
03/12/2013 05:09:18 PM
NGH-Ph.1 prototypes
03/12/2013 05:09:04 PM
Full T2 prototypes
03/12/2013 05:08:55 PM
Deliverable D10.1 - Specifications of prototypes - step1
03/12/2013 05:08:45 PM
Evaluation of NGH
03/12/2013 05:08:36 PM
ENGINES TF9 D9.1 Comparison of Simulation, Laboratory and Field Trials of T2
03/12/2013 05:08:32 PM
DVB-T2 Interoperability Tests
03/12/2013 05:08:27 PM
Impact of CBS on network architecture
03/12/2013 05:08:18 PM
TECHNICAL REPORT TR6.1 INTERMEDIATE PROGRESS REPORT ON TF6 END-TO-END SYSTEM INTEGRATION (V3))
03/12/2013 05:08:09 PM